SCHOMBERG LIONS PLAY PARKETTE HAS A WHOLE NEW LOOK

221 Main Street, Schomberg ON

A Great Gathering Space for the Community

Sidewalkable Saturday

Light the Night

THE NEW DESIGN INCORPORATES THE AMENITIES OF A PLAZA AND A PLAYGROUND

Features of This Design

  • Concrete walkway at entry with three patio tables overlooking river
  • Shade structure which also serves as an amphitheatre
  • Play area with a climbing structure and swings
  • Bicycle rack and bicycle repair station
  • Two power sources
  • Black wrought iron fence overlooking river

The Schomberg Main Street Revitalization Strategy was Endorsed by Council on May 13, 2019

Action Item 28 Reads:

"Ensure Lion’s Park improvements take into consideration Destination Development Association’s best practices for creating a gathering space/plaza. Incorporate river into design and include an activation area."